Past Performance

        Our company built an excelent reputation over the years by working in many projects in many fields, including construction, supplying, electric works, and services. The following table shows the projects and contracts we accomplished.

No. Project Name Scope of Work  Quantity Area  Customer Year
1  GSM Phase 2 New Site DT  - Conduct DT for the new sites with all DT scenarios ( to check HO, Call accessibility, Call Retainability for each cell) 300 (North & center) regions  Korek 2013  - 2014   
 - Analyze log files and pre optimize the RXlev, RXqual, SQI optimization (By Tune frequencies, Tune some DB Parameters, Physical changes recommendations). 
 - Perform the Site Integration Report after pass all the operator requirements.
 - Get Acceptance for site.
2 3G Phase 1 SSV & Cluster DT  - Conduct New Site DT for 3G network to check CS voice and Video calls , CS cell reselection & Handover , PS throughput tests (HSDPA,HSUPA,R99) & PS Handover + site DT. 300 Baghdad / Anbar / Diyala / Salah Aldien Ericson / Zain 2014
 - SSV Acceptance report preparation 
 - Cluster Acceptance Report preparation ( Pre Optimization & Recommendations).
3 3G new Site Installation  -  Site survey and photo Report. 120 Baghdad / Anbar / Diyala / Salah Aldien Ericson / Zain 2014
 - Telecom 3G Modules installation inside the 2G  RBS 
 - Limited civil scope (Side arms Installation , Fiber short tray, grounding …etc)
 - PBC or PBU installation depends on the RBS configuration (ID/OD)
 -  New Batteries installation .
 - Installation of a new single band antennas or swap the exited antennas with tri band antennas and a connection to RBS (Fiber)
 - ATP with customer
4 3G Phase 1  Cluster DT  - Cluster DT  5 Baghdad  Ericson / Korek 2014
5 FTK new site phase 1   - Installation 30 site BSS in Baghdad  30 Baghdad Darin / Korek 2010 - 2011
6 FTK new site for north project  - Installation 3 sites in (Dhouk, Mosul, Telafar)    3 Baghdad Metco / Zain 2010 - 2011
7 Audit & Drive test 1000 site  - Working at Baghdad & Sulaimania 1000 site as audit & drive test with Aircom company for Asiacell 1000 Baghdad, Sully Aircom / Asia 2007 - 2008
8 Urgent installation FTK 7 mobile station  - Insulation FTK 7 mobile station in (Karblaa,Najaf) to Korek company  7 Najaf, Karblaa Korek 2012
9 Installation three switchboard  - Installation three tower in Baghdad high of 60m  3 Baghdad Alawsat , ministry of communication 2013 - 2014
10 3G new Site Installation  - supply 300 side arm to Alawsat company for 3G project  300 Baghdad Alawsat , Zain 2013
11 Installation & expansion  for north 3G project  - Installation & expansion 70 site as BSS & TRM in Erbil & Sulaimania for Darin company  70 Erbil & Sulaimania Darin / Korek 2014
12 TRM New Links Installation  - New TRM Route (6 BB) Full Installation ,  Links Alignment & ATP 6 Anbar Metco / Zain 2014 – 2015
13 FUEL SUPPLY & MAINTENANCE CONTRACT  Diesel supplying: 144 Site Kirkuk Zain 2012 - till now
- Contractor shall supply I fill a premium diesel to each site of -Zain sites and keep the fuel tank full. The fuel level should not be less than 1000 liters for all the time for the 2500 fuel tanks, 700 liters for all the time for 2000 fuel tanks.
- Fuel samples must be taken from daily service tank for analyzing and result to be submitted to-Zain Engineers.(fuel density should not be less than (820 gr/liter) in all Iraq seasons temperature degrees.
GENERATOR OVER HAULING & The Contractor shall provide standby mobile generators to maintain continuity of service in the sites during the maintenance periods.
Preventive Maintenance (Full maintenance of the Power Generators, Air Conditioning System, DC power system, AC controller ,ATS, Aviation lights with its control, shelter lights, sensors and the ACPDB to keep them running perfectly 24 hours a day)
SUPPLY EQUIPMENTS AND SPARE PARTS (The contractor shall provide all required spare parts stock to be available for emergency cases)
A/C PARTS REPLACEMENT
AIR CONDITIONERS SCHEDULE MAINTENANCE
GENERATOR SCHEDULE MAINTENANCE
CHECKING FOR THE GENERATORS BY THE CONTRACTOR TEAM IN ATTENDANCE OF POWER TEAM
The contractor should provide professional team for emergency cases 24Hrs.
The contractor shall provide overnight team to be closest to the compounds and according to power dept. instructions and needs.
14 FUEL SUPPLY  Diesel supplying:
- Contractor shall supply I fill a premium diesel to each site of -Zain sites and keep the fuel tank full. The fuel level should not be less than 1000 liters for all the time for the 2500 fuel tanks, 700 liters for all the time for 2000 fuel tanks.
- Fuel samples must be taken from daily service tank for analyzing and result to be submitted to-Zain Engineers.(fuel density should not be less than (820 gr/liter) in all Iraq seasons temperature degrees.
75 Site Kirkuk Saqer Al-Badiya / Zain 2008
15 85 site Kirkuk IDS / Zain 2009 - 2011
16 115 site Diyala Noor Baqeea & IDS / Zain 2010 - 2012
17 Design and   implementation of surveillance systems  - Design  & maintain surveillance systems (Control, thermal, night vision,...etc.) for a lot of companies and Government departments.   center & south regions   2013 – 2014
18 Software design and development  - Design and install database servers and design professional GUI (standalone-web application) to   Baghdad    2013 - 2014
 meet our client’s requirements.
19 Building Al kor Culvert in Al Rashad  - Limited civil scope. 3 Kirkuk JCC 2007 - 2008
20 Building Al Yargon School  - Limited civil scope. 2 Kirkuk JCC 2007 - 2008
21  Building  a Water Tank in  Al-Qamar Village  - Limited civil scope. 1 Kirkuk Ministry of Migration & Displacement 2005 - 2006

Teebco corporation established to cover four main services in term of telecom field:

Network planning

We offers consulting services represented by the technical and business performance.

Network Deployment NIS

Our managed end-to-end service solution works on a build-operate-manage model.

Network Operation FLM

We provide full operation and maintenance to the deployed network from end to end .

Security Services

According to the Iraq situation, We deliver a complete sercurity package.

Recent Works